When job execution fails, the SNP processes attempts to rerun the job one minute later. If this run fails, another attempt is made in two minutes and another in four minutes. The job queue doubles the retry interval until it exceeds the normal execution interval, which is then used. After 16 consecutive failures, the job is flagged as broken and will not be re-executed by the job queue without user intervention.
The next_date parameter can be set to a time in the past. Jobs are chosen for execution in order of their next execution dates, so setting a job's next_date back can effectively move the job ahead in the queue. This can be useful in systems where the job queue processes are not keeping up with jobs to be executed, and a specific job needs to be executed as soon as possible.
The interval parameter is a character string representing a valid Oracle date expression. This date expression is evaluated each time the job begins execution. When a job completes successfully, this date becomes the next execution date for the job. It is important to remember that interval evaluation and updating the job's next execution date happen at different times. For instance, a job that takes one hour to complete and has interval set to SYSDATE+1/48 (every 30 minutes) will constantly execute, because each time it completes, it will already be 30 minutes late to execute again.
The interval expression must evaluate to either a NULL value or a time in the future. When interval evaluates to a NULL value, the job will not be re-executed after the next execution and will be automatically removed from the job queue. Thus, to execute a job one time only, pass a NULL value for the interval parameter.
jobs are no longer executing automatically.
If forced (exec dbms_job.run(), these execute fine.
Cause
Trying the most common reasons why jobs don't execute automatically and as scheduled:
1) Instance in RESTRICTED SESSIONS mode?
2) JOB_QUEUE_PROCESSES=0
3)_SYSTEM_TRIG_ENABLED=FALSE
4) Is the job BROKEN?
5) Is the job COMMITted?
6)If uptime>497 and the jobs do not execute automatically, then you are hitting bug 3427424
(Jobs may stop running after 497 days uptime) which is fixed in 9206 and A102
7)Check dba_jobs_running to see if the job is still running
8)Check if the last_date and next_date for the job are proper:
9)Check if the Next_date is changing properly as per the interval set in dba_jobs
reference 《Oracle Built-in Packages》and MOS
The next_date parameter can be set to a time in the past. Jobs are chosen for execution in order of their next execution dates, so setting a job's next_date back can effectively move the job ahead in the queue. This can be useful in systems where the job queue processes are not keeping up with jobs to be executed, and a specific job needs to be executed as soon as possible.
The interval parameter is a character string representing a valid Oracle date expression. This date expression is evaluated each time the job begins execution. When a job completes successfully, this date becomes the next execution date for the job. It is important to remember that interval evaluation and updating the job's next execution date happen at different times. For instance, a job that takes one hour to complete and has interval set to SYSDATE+1/48 (every 30 minutes) will constantly execute, because each time it completes, it will already be 30 minutes late to execute again.
The interval expression must evaluate to either a NULL value or a time in the future. When interval evaluates to a NULL value, the job will not be re-executed after the next execution and will be automatically removed from the job queue. Thus, to execute a job one time only, pass a NULL value for the interval parameter.
jobs are no longer executing automatically.
If forced (exec dbms_job.run(
Cause
Trying the most common reasons why jobs don't execute automatically and as scheduled:
1) Instance in RESTRICTED SESSIONS mode?
2) JOB_QUEUE_PROCESSES=0
3)_SYSTEM_TRIG_ENABLED=FALSE
4) Is the job BROKEN?
5) Is the job COMMITted?
6)If uptime>497 and the jobs do not execute automatically, then you are hitting bug 3427424
(Jobs may stop running after 497 days uptime) which is fixed in 9206 and A102
7)Check dba_jobs_running to see if the job is still running
8)Check if the last_date and next_date for the job are proper:
9)Check if the Next_date is changing properly as per the interval set in dba_jobs
reference 《Oracle Built-in Packages》and MOS
「喜欢这篇文章,您的关注和赞赏是给作者最好的鼓励」
关注作者
【版权声明】本文为墨天轮用户原创内容,转载时必须标注文章的来源(墨天轮),文章链接,文章作者等基本信息,否则作者和墨天轮有权追究责任。如果您发现墨天轮中有涉嫌抄袭或者侵权的内容,欢迎发送邮件至:contact@modb.pro进行举报,并提供相关证据,一经查实,墨天轮将立刻删除相关内容。




