暂无图片
暂无图片
暂无图片
暂无图片
暂无图片

20191120宁夏移动xj库rac节点IPC send timeout导致reboot

问题描述

故障现象:
1、2#09:05/09:57发生2次数据库重启;
2、1#数据库alertlog有大量IPC send timeout错误报出来。
2019-11-20T09:05:22.546713+08:00
Instance terminated by LMHB, pid = 16359
2019-11-20T09:05:22.548287+08:00
Warning: 2 processes are still attach to shmid 3080201:
(size: 24576 bytes, creator pid: 14528, last attach/detach pid: 16294)
2019-11-20T09:05:23.051247+08:00
USER (ospid: 17111): terminating the instance
2019-11-20T09:05:23.053027+08:00
Instance terminated by USER, pid = 17111
2019-11-20T09:05:25.136753+08:00
Starting ORACLE instance (normal) (OS id: 18239)
2019-11-20T09:05:25.155853+08:00
CLI notifier numLatches:89 maxDescs:8500
2019-11-20T09:05:25.164135+08:00



2019-11-20T09:57:22.189510+08:00
License high water mark = 353
2019-11-20T09:57:27.613988+08:00
Instance terminated by USER, pid = 19418
2019-11-20T09:57:27.615533+08:00
Warning: 2 processes are still attach to shmid 4718601:
(size: 24576 bytes, creator pid: 18239, last attach/detach pid: 19330)
2019-11-20T09:57:28.190667+08:00
USER (ospid: 5256): terminating the instance
2019-11-20T09:57:28.192611+08:00
Instance terminated by USER, pid = 5256

专家解答

此文章为内部加密内容,您没有查看权限
「喜欢这篇文章,您的关注和赞赏是给作者最好的鼓励」
关注作者
【版权声明】本文为墨天轮用户原创内容,转载时必须标注文章的来源(墨天轮),文章链接,文章作者等基本信息,否则作者和墨天轮有权追究责任。如果您发现墨天轮中有涉嫌抄袭或者侵权的内容,欢迎发送邮件至:contact@modb.pro进行举报,并提供相关证据,一经查实,墨天轮将立刻删除相关内容。

评论