暂无图片

CRS-07511:There is a delay of more than 'number' milliseconds in processing the Oracle Grid Infrastructure process requests by the 'worker thread' of Oracle Grid Interprocess Communication(GIPC). Additional Diagnostics

错误码

错误描述:There is a delay of more than 'number' milliseconds in processing the Oracle Grid Infrastructure process requests by the 'worker thread' of Oracle Grid Interprocess Communication(GIPC). Additional Diagnostics
错误原因:The reason for this issue was one of the following:- The 'worker thread' was not scheduled by the operating system in a timely manner.- The system was heavily loaded.- The 'worker Thread' was busy in handling other requests.
解决方法:(a) Reduce the load on the system or add a new node to the existing cluster, if the system was heavily loaded. (b) Check if the 'worker Thread' is busy in handling other requests.

向认证技术专家提问

向技术专家提问

相关搜索
查看更多》