alter system switch logfile 频繁时,14组redolog很快撑满,检查后台日志发现切换日志时checkpoint并没有完成,需要等2-3分钟才能完成。
手工执行alter system checkpoint也需要等3分钟左右才能完成。
Beginning global checkpoint up to RBA [0x8639.16c8cb.10], SCN: 7934011180
Fri Apr 26 16:32:56 2019
Thread 1 cannot allocate new log, sequence 34362
Private strand flush not complete
Current log# 13 seq# 34361 mem# 0: /home/opt/11g/oracle/oradata/orcl/redo13.log
Fri Apr 26 16:33:11 2019
Beginning log switch checkpoint up to RBA [0x863a.2.10], SCN: 7934155570
Thread 1 advanced to log sequence 34362 (LGWR switch)
Current log# 6 seq# 34362 mem# 0: /home/opt/11g/oracle/oradata/orcl/redo06.log
Fri Apr 26 16:36:09 2019
Completed checkpoint up to RBA [0x8637.2.10], SCN: 7932927739
Fri Apr 26 16:36:13 2019
Thread 1 cannot allocate new log, sequence 34363
Private strand flush not complete
Current log# 6 seq# 34362 mem# 0: /home/opt/11g/oracle/oradata/orcl/redo06.log
Beginning log switch checkpoint up to RBA [0x863b.2.10], SCN: 7934640980
Thread 1 advanced to log sequence 34363 (LGWR switch)
Current log# 9 seq# 34363 mem# 0: /home/opt/11g/oracle/oradata/orcl/redo09.log
Fri Apr 26 16:37:51 2019
Completed checkpoint up to RBA [0x8638.2.10], SCN: 7933190148
Fri Apr 26 16:38:06 2019
Completed checkpoint up to RBA [0x8639.2.10], SCN: 7933593612
Completed checkpoint up to RBA [0x8639.16c8cb.10], SCN: 7934011180
Fri Apr 26 16:38:39 2019
Completed checkpoint up to RBA [0x863a.2.10], SCN: 7934155570
Fri Apr 26 16:39:43 2019
Thread 1 cannot allocate new log, sequence 34364
Private strand flush not complete
Current log# 9 seq# 34363 mem# 0: /home/opt/11g/oracle/oradata/orcl/redo09.log
Beginning log switch checkpoint up to RBA [0x863c.2.10], SCN: 7935058947
Thread 1 advanced to log sequence 34364 (LGWR switch)
Current log# 7 seq# 34364 mem# 0: /home/opt/11g/oracle/oradata/orcl/redo07.log
Fri Apr 26 16:41:35 2019
Completed checkpoint up to RBA [0x863b.2.10], SCN: 7934640980
Fri Apr 26 16:42:03 2019
Thread 1 cannot allocate new log, sequence 34365
Private strand flush not complete
Current log# 7 seq# 34364 mem# 0: /home/opt/11g/oracle/oradata/orcl/redo07.log
Beginning log switch checkpoint up to RBA [0x863d.2.10], SCN: 7935547884
Thread 1 advanced to log sequence 34365 (LGWR switch)
Current log# 4 seq# 34365 mem# 0: /home/opt/11g/oracle/oradata/orcl/redo04.log
Fri Apr 26 16:42:35 2019
Thread 1 cannot allocate new log, sequence 34366
墨值悬赏

评论
